The fabric for my big new projects should be here by the end of the day on Monday, so I'm finishing up -- and starting -- a few last things before it gets here and I plunge in.
I've got the last squares cut for the drab postage stamp quilt and I'm sure I mean it this time. I cut six hundred 2" squares out of the thousand I'm going to need for another project. While I was messing with the two inch strips for that, I cut a bunch of pieces for cheddar bow ties. And I finally got started on this month's square for the Quilt Square Quilt Along. Those bear paws are so tiny!
Weekly Stash Report
Fabric Used this Week: 0 yard
Fabric Used year to Date: 14.5 yards
Added this Week: 8 yards
Added Year to Date: 28 yards
Net Added for 2012: 13.5 yards
To see more weekly stash reports, click over to Patchwork Times. And don't forget to enter the Back to Charm School Giveaway.
3 comments:
That sure is a lot of cutting. It will be ages before I attempt a postage stamp quilt. I love the pink rotary cutter! I didn't know they made them in colors. I just have a grey and orange one.
Drab postage stamp has my interest. Also, Well done for doing at that cutting at once. So Smart too actually 600 down 3only 400 to go.
Your numbers are much better than mine. Hoping I'll be going through more real soon.
Jane
Wow! That's a lot of cutting (my wrist hurts just at the thought LOL!). Love the bear paw..can't wait to see your next project!
(BTW, you can rent a Jeep in Death Valley if you don't own one...great way to see the Racetrack). :o)
~Terry~
Post a Comment